> QUOTING

How quoting works

A quote that fits the building. We survey the site, design the system it actually needs, and price it in writing — so the number you approve is the number you pay. Indicative starting bands for every service are published on the pricing page.

Last updated: 2026-10-12

QUOTING

The bands on the pricing page are indicative starting points, not a quotation. Scope — and therefore price — is confirmed in a written, itemised quote after a site survey, and the terms below (24% Greek VAT unless reverse charge, 40/40/20% payment milestones, 30-day validity) apply to every project.

From first message to signed scope

Four steps. Each one removes guesswork before you commit to anything.

  1. 01 · Site survey

    We walk the property with you: coverage, cable routes, containment, power, and the constraints that only ever appear on site. Heat mapping or an off-island visit are planned where they genuinely add accuracy. This is where real numbers come from.

  2. 02 · Design & scoped quote

    You receive a proposed architecture, a bill of materials sized to your building, and a written quote. A fixed scope means no extras appearing quietly during install.

  3. 03 · Delivery & commissioning

    Installation, labelling, and configuration by the team that designed it. Copper and fibre links are tested and documented, and the handover pack is yours to keep.

  4. 04 · Support

    Optional SLA coverage with agreed response times, remote diagnostics, and a firmware policy — written for your site rather than printed on a poster.

What we scope

Tell us what the property needs — the planner for that service is the fastest way, or simply send a message. Nothing gets priced until we have seen the building.

Support on your terms

Maintenance is written after an inventory of what is actually installed, so you never pay for coverage the site cannot use. Retainer levels and their monthly starting bands are published on the pricing page; response targets are agreed for your property.

  • Business hours

    Weekday coverage (Mon–Fri 09:00–17:00) with remote-first response — a sensible fit for single sites and smaller properties.

  • Extended

    Evening and Saturday coverage with an eight-hour on-site target — the usual fit for most hotels and villas in season.

  • Critical

    Named on-call with a four-hour critical target and a direct emergency path for high-uptime sites.

Where to start

Pick the property type below. The planner for that stack captures what you need; the survey confirms the building.

What a scoped quote includes

Survey findings, a proposed architecture, a bill of materials sized to the site, the install and commissioning effort, and optional support. Brands come from the stacks we actually deploy (Ubiquiti, Cisco, Hikvision, Ajax, KNX vendors) rather than a single locked catalogue.

Survey versus guessing

Stone walls, guest density, and outdoor terraces change WiFi, CCTV, and cabling counts. A planner captures intent; a survey captures RF, routes, and constraints. We would rather measure once than guess twice.

Without a surveyAfter a KOMVOS survey
Guessed access point and camera countsCounts from a walkthrough and, where useful, heat mapping
A generic kit listA bill of materials matched to racks, power, and vendor fit
Extras discovered during installContainment, labelling, and certification already in scope
Nothing handed overAs-built labels, test results, and documentation

Payment, VAT, validity

Once the quote is signed: 40% to confirm and order hardware, 40% when installation starts, 20% at handover acceptance. Quotes are valid 30 days and Greek VAT at 24% is shown separately unless a reverse-charge invoice applies. Travel and freight are itemised lines, never a surprise at commissioning.

What stands behind the number

  • The same team surveys, designs, and commissions the work, so the quote is written by the people who will deliver it.
  • Copper and fibre links are tested and labelled to the design pack, so the handover is usable by the next engineer.
  • Scopes we bid every season: off-season hotel guest WiFi, discreet villa CCTV with terrace coverage, KNX lighting and shading. No invented portfolio counts.
  • English and Greek, and answers from a human. Anything you sign is documented in writing before work starts.

How to start

Open the planner for the system you need, or simply send a message — WhatsApp and phone are on +30 698 3504 588, email is komvossystems@gmail.com. A survey date is usually the next step, and the written quote follows within days. The pricing page shows the indicative bands; this page walks through the process.

> FAQ

How does the indicative band relate to my quote?

The band is an entry point for a typical site of that type; your quote is the figure for your building. After the survey you receive the architecture, the bill of materials, and an itemised total — and you accept or refuse it before anything is ordered.

Why is the quote usually different from the published band?

Because cabling metres, access point counts, camera fields of view, containment, and vendor choice all depend on the site. The band gets you into the right budget range; the survey turns it into a number you can act on.

Is VAT included?

Bands and quotes both exclude 24% Greek VAT unless a reverse-charge invoice applies. The quote states clearly what is included and what is not.

How do payments work?

After a signed quote: 40% to confirm and order hardware, 40% when installation starts, 20% at handover acceptance. Different splits can be agreed in writing for long hotel shutdowns.

How long is a quote valid?

30 days, unless the quote says otherwise. Hardware lead times on the islands can move a later requote.

Do you work away from the base?

Yes — the Cyclades, mainland Greece, and selected sites further afield. Travel, freight, and overnight costs are itemised on the quote rather than folded into the total.

Is the planner a quote?

No. The planner structures your requirements so the survey and the quote can be accurate. Submitting it notifies us; it does not fix a price.

Can I buy design only?

Yes. Survey plus a design pack is a standalone engagement: architecture, bill of materials, and documentation without an install commitment. It is quoted on the same survey-led basis.

How is maintenance priced?

Retainers are quoted per site after an inventory of the installed systems, so the coverage matches what is really on the wall. Levels, response targets, and visits are written into the contract.

Where can I see the numbers?

On the pricing page — indicative bands per service, retainer levels, and the commercial terms that apply to every project.

Last updated: 2026-10-12